Simple Time Line


2016 November Official Opening of the BECC

2016 September Building & landscaping Complete

2016 May 0perating Theatre Complete

2016 February Finishing Touches.

2015 November  First Ear Camp in our new Home.

2015 July  Ready to move BEHCS into Ground Floor.

2015 March  Fitting out under way.

2014 November  Building shell & first fix complete.

2014 June      Frame to roof level and roof installed.

2014 March    First floor level and floor installed.

2014 January  Foundation completed to tie-beam.

2013 November/ December  Foundations of BECC

2013 May -September  Securing site, walls & outbuildings.

2013 March  Laying of foundation stone

2013 January/February  Demolition.

Pre 2013  Planning negotiating and purchasing the land.

Illustrated events (browse the BECC pages for details)

2014 January - Foundation completed to tie-beam.

Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)



Tie Beam Complete

2013 November/ December - Foundations of the main BECC building started.

Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)

2013 May - September - All four boundary walls have been rebuilt to a height of 10 feet, together with guard house, covered cycle shed and generator house and new secure entrance gates.

Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)



2013 March - laying of foundation stone


Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)




2013 January/February - Demolition of the old building and clearance of the site.

DemolitionClick on the image to see more

(Sorry, this page may download slowly and they use Java script, to present  the images)





The Foundations Securing The Site Demolition The Foundations

2014 March    First floor level and and beyond.

Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)

Up to first floor

2014 June  Frame to roof level and roof installed.


The concrete structure is complete with its roof.


Click on the image to see more

(Sorry, this page may download slowly and they use
Java script, to present images)


Fame & Roof

2014 October


The walls are now clad and ready for windows.

Reminders of the original building are appearing on
the balcony section.


Seeing the people aloft illustrates the scale of this Ear Care Centre project.





2014 November


The exterior is waiting for paint and some glass.

The inside is now well under way with services and

tiling. The construction team have pulled the project

forward to regain two months in the schedule.


Click on the image to see more



Fame & Roof

2015 March


The interior is progressing apace. However, there is a lot to be done. Fitting out a medical facility involves a a lot of detailed work. The photo shows the exterior looking smart but with some ground-work still needed.


  Click on the picture for details and images



Fitting Out

2015 July


The BRINOS Ear Health Community Service (BEHCS) can now move into the ground floor. The BRINOS Ear Camp surgical team will use part of the ground floor until the proper facilities are ready on the first floor.


  Click on the picture for details and images



Moving In

2015 November

The interior is virtually finished, so it’s really only the Theatre, with its specialist needs, that is left to be completed.  The external ground-works will need to be carried out but now the monsoon season has passed, the painting of the exterior is under way.


 Click on the picture for details and images

Operating!

2016 March


The BECC is now in use by the Surgery team and the Ear Heath Care team. The building has its coat of paint and the “landscaping” is under way. Meanwhile the actual Operating Theatre is in use.


 Click on the picture for details and images

Finishing Touches

2016 May - July


Finishing the operating theatre:


The British Medical Association (BMA) Charitable Donations Committee awarded BRINOS £8,000 towards the completion of the operating theatre.


This has covered the terrazzo floor and marble work surfaces, the carpentry work to create all the cupboards, the stainless steel scrub-up sink and 3 Air Conditioning units.


St Marks Overseas Aid Trust (SMOAT) for funding a specialist mechanical multi-positional operating table.



Scrub Sink

Hygienic finishes in the Operating Theatre

2016 19th November


During the 59th Ear Camp in November 2016, The BECC was formally opened. Unveiling the plaque was Dr Neil Weir (Director of BRINOS) in the presence of Mr Bimal Tandon (Chairman of BEHCS).



 Click on the picture for details and images

The Opening